Schedule G - General Service
This Schedule is available to consumers for residential and farm three-phase service; for non-residential and non-farm single and three-phase service (including schools, churches, public buildings, and commercial and industrial establishments) with peak registered demands of less than 50 kilowatts;
Click here for more information on the General Rate Schedule
Schedule G-TOD - General and Large Power Time of Day Service
This Schedule is available on a voluntary and limited basis, at the Cooperative's option, to consumers who would be served otherwise under the General Service or Large Power Service Schedule.
Click here for more information on the General and Large Power Time of Day Service Rate Schedule
Schedule I - Industrial Service
This Schedule is available for nonresidential service with installed transformer capacity in excess of 1,000 kVA. Service under this Schedule shall be used solely by the Consumer in a single enterprise, located entirely on a single, contiguous premise.
Click here for more information on the Industrial Service Rate Schedule
Schedule LP - Large Power Service
Service is available under this Schedule to non-residential consumers with peak registered demands of 50 kilowatts or more.
Click here for more information on the Large Power Service Rate Schedule.
Riders
Wholesale Power Cost Adjustment
Wholesale Power Cost Adjustment (WPCA) is a correction or modification on a consumer’s monthly electric bill designed to compensate for monthly fluctuations in wholesale power costs not covered in the basic rate structure.
Click here for more information on the Wholesale Power Cost Adjustment